Mads Tranum Nielsen
20 years of services in dairy design, technology and commissioning.
Assignments:
2017: Almarai, Saudi Arabia
-Commissioning and service assignments on CPP1 and CPP2
-Commissioning off complete New Re-combined process Feta line. PHE, homogenizer, Flex mixer, AMF storage, Mixing and Storage tanks, Flip flop tank system for Salt and GDL dosing, all the way to Primodan and/or Repack fillers.
-Re-locating Liquiverter, and start up on new products.
-New dosing line from Frozen cream tank to existing cream PHE.
2016: Almarai, Saudi Arabia
-Commissioning and service assignments on CPP1 and CPP2
-Commissioning off new Gista (breakfast cream) line on P6.
-Commissioning off New Juice recovery system.
-Re-building hot water system on existing UHT plant.
-Commissioning off New BFC (breakfast cream tank)
Danya, Saudi Arabia
-Designing and installation off Salt and GDL unit for Feta cheese.
-Commissioning and start up off Salt and GDL unit.
-Test on product to Tetra filling machine.
Al Rawabi, Dubai
-Re-location and commissioning off Brix Master for juice.
Al Safi, Saudi Arabia
-Service visit regarding separator issues.
2015: Almarai, Saudi Arabia
-Commissioning of New P4 Tubular Heat Exchanger, separator, de-aerator, homogenizer, etc., etc.
-Commissioning of new Fruit Pure Cooker.
-Commissioning and service assignments on CPP1 and CPP2
Danya, Saudi Arabia
-Commissioning of New Process Cheese Plant, SSHE, Homogenizer for 1000Kg. of process cheese.
-Commissioning of creaming tanks for triangle process cheese.
Al Mansur, Egypt
-Trouble shooting on UHT plant, with bacteriological un-sterility.
-Crack test on PHE (water/product)
-Completely dismantling off UHT plant to check for un-sterility.
-Check on PHE and holding cell for pre-pasteurised milk to UHT plant.
Barakat, Dubai
-Commissioning off new Juice mixing tanks, Tubular cooler for juice and a new single shot CIP plant.
2014: Almarai, Saudi Arabia
-Commissioning and service assignments on CPP1 and CPP2
-Commissioning of Tekfa dosing system for Salt and GDL (Feta Cheese)
-Optimising of the RCC plant, to get a better and more flexible CIP routine
Danya, Saudi Arabia
-Design and installation support for 5 new Fermenting tanks, new CIP Plant, Butter Melter and rebuilding of existing mixing tanks.
-Commissioning of the above-mentioned equipment.
KDC, Kuwait
-Trouble shooting on UHT plant, where the milk got diluted.
Tine, Norway
-Re-commissioning off 5 central CIP plants
-Re-commissioning off CIP routes, tanks, lines, PHE, separators etc., etc.
2013: Almarai, Saudi Arabia
-Commissioning and service assignments on CPP1 and CPP2
-Commissioning of new PHE 8
Danya, Saudi Arabia
-Commissioning of New Process Cheese Plant, SSHE, Homogenizer for 3000Kg. of process cheese.
Akureyri, Island
-F.D. (functional descriptions) for New chees tanks and starter culture line.
2012: Almarai, Saudi Arabia
-Commissioning and service assignments on CPP1 and CPP2
-Commissioning of new PHE 50.000L/H
-Service assignment at other APV customers across Saudi Arabia, Nadec,
Al Safi and Najdiyah.
KDD, Kuwait (Kuwait Danish Dairy)
-Commissioning of New 18 line CIP plant.
-Commissioning and support of new ice cream plant.
2011: Almarai, Saudi Arabia
-Commissioning and service assignments on CPP1 and CPP2
-Service assignment at other APV customers across Saudi Arabia.
Colun, Chile:
-Commissioning off 4 central CIP plants.
-Commissioning off CIP on all process equipment.
-F.D. (functional descriptions) for New salt/brine mixing tanks, cheese stacking system, and brine vats.
-Commissioning off energy recovering water system.
-Commissioning off fine (curd) separators (sieves)
2010: Almarai, Saudi Arabia
-Commissioning and service assignments on CPP1 and CPP2
-Commissioning Sterile AIR system for Laban fermentation tanks CPP1.
-Commissioning of AMF dosing system.
-Commissioning New Flex Mixer for Feta production
Najdiyah, Saudi Arabia
-Service and troubleshooting on old UHT plant.
Al Safi, Saudi Arabia
-Service support on PHE and Westfalia Separators.
Mar. 2009 – end 2009:
Almarai, Saudi Arabia
-Commissioning of New central CIP plant for Laban fermentation area.
-I.O. check and commissioning of 6 new Laban fermentation tanks.
-Commissioning of New Cream tanks CPP2
Jan. 2009 – Mar.2009
ARLA FOODS, KRUSÅ, DENMARK.
– Commissioning of the whey treatment plant.
– Commissioning of whey PHE and Westfalia separator/clarifier.
– Training personnel in daily running of the plant.
Mar. 2008 – Oct. 2008:
Nam Yang, milk treatment plant, South Korea
A green field project, producing flavored UHT milk products.
COMMISSIONING/SITE MANAGER
– Commissioning of 2 central CIP plant and all CIP on process equipment
– Commissioning planning and start up of the process equipment.
– Supervising & managing commissioning.
– Training personnel in daily running of the plant.
– Finalizing & handing over the project.
May. 2007 – Dec. 2007:
MlekPol, Cheese plant, Poland
– I/O test on equipment.
– Commissioning of the 12 line central CIP plant and all CIP on process equipment.
– Commissioning of 4 milk Pasteurizers for cheese production.
– Commissioning of the whey treatment plant.
– Commissioning of 2 Westfalia separators and clarifiers for whey treatment.
– Training personnel in daily running of the plant.
Feb. 2007:
Ostrowia, Cheese plant, Poland
– I/O test on equipment.
– Commissioning of the central CIP plant.
Nov. 2006 – May. 2007:
Karat, Cottage Cheese plant, Moscow Russia
COMMISSIONING MANAGER
– I/O test on equipment.
– Commissioning of the central CIP plant and all CIP on process equipment.
– Commissioning of Cheese milk PHE and Westfalia separator.
– Commissioning of Cream PHE.
– Commissioning culture production.
– Commissioning Bepex Equipment: Whey Drainer, Washer & Cooler and Creamer
– Training personnel in daily running of the plant.
– Finalizing & handing over the project.
Aug. 2006 – Oct. 2006:
Famous Brands, sauce factory, South Africa
– Functional descriptions.
– I/O test on equipment.
– Commissioning of Tubular Heater for sauces.
– Commissioning all CIP on process equipment.
– Training personnel in daily running of the factory.
Feb. 2006 – Jul. 2006:
WHEYCO, (HUMANA & NORDMILCH), ALTENTREPTOW, GERMANY.
– Functional descriptions.
– I/O test on equipment.
– Commissioning of the central CIP plant and all CIP on process equipment.
Dec. 2005 – Feb. 2006:
Dominant, Cheddar Cheese Dairy, Rostov, Russia
– I/O test on equipment.
– Commissioning of the central CIP plant and all CIP on process equipment.
– Commissioning of Cheese milk PHE and Westfalia separator.
Mar. 2005 – Sep. 2005:
SDC Milk, Geo Chang, South Korea.
A green field project, producing flavored UHT milk products.
– Process descriptions.
– Functional descriptions.
– I/O test on equipment.
– Commissioning planning and start up of the 4 CIP plants and all CIP on process equipment.
– Training personnel in daily running of the plant.
May. 2004 – Dec 2004:
AgroFerm, Lysine plant, Esbjerg, Denmark
– I/O test on equipment.
– Commissioning of the central CIP plant and all CIP on process equipment.
– Commissioning on Fermentation process equipment.
Mar. 2004:
Frikom/Ledo, Icecream, Belgrad, Serbia.
– I/O test on equipment.
– Commissioning of the central CIP plant and all CIP on process equipment.
Oct. 2003 – Nov. 2003:
Valio, Yoghurt plant, Oulu, Finland
– Commissioning of Youghurt milk PHE and Alfa, separator.
– Commissioning of Cream PHE.
– Commissioning of VFN unit (Evaporator)
Mar. 2003 – Jul. 2003:
Campina International, Stupino, Russia. Long shelf life, yoghurt.
– I/O test on equipment.
– Commissioning of the central CIP plant and all CIP on process equipment.
Jul. 2002 – Dec. 2002:
Al Ain Dairy Factory, United Arab Emirates
– I/O test on equipment.
– Commissioning of the central CIP plant and all CIP on process equipment.
– Commissioning of the yoghurt process plant.
– Commissioning culture production.
– Commissioning of the juice process plant.
Jun. 2002:
Almarai, Milk, juice and deserts processing plant, Saudi Arabia.
– Service visit.
May. 2002:
Nestle, Navanakorn, evaporated milk, Thailand.
– Service visit.
Jul. 2001 – Feb. 2002:
Khampang Phet, Brewery, Thailand.
– I/O test on equipment.
– Commissioning of the 5 central CIP plants and all CIP on process equipment.
Feb. 2001 – Jun. 2001:
Nestle, Navanakorn, evaporated milk, Thailand.
– I/O test on equipment.
– Commissioning of the 2 central CIP plants and all CIP on process equipment.
– Training personnel in daily running of the plant.
Jun. 2000 – Dec. 2000:
SAB, Brewery, Port Elisabeth, South Africa.
– Functional descriptions.
– I/O test on equipment.
– Commissioning of the 2 central CIP plants and all CIP on process equipment.
– Training personnel in daily running of the plant.
Jan. 2000 – May. 2000:
Khabarowsk, Baby Food Plant, Russia
– I/O test on equipment.
– Commissioning of the central CIP plant and all CIP on process equipment.
– Training personnel in daily running of the plant.
Sep. 1999 – Nov. 1999:
Arla Foods, Toulov, Denmark. Greenfield plant producing Cheese.
– Commissioning of 2 central CIP plants and all CIP on Cheese and brining equipment.
– Training personnel in daily running of the plant.
Jun. 1999 – Aug. 1999:
Dukat/Lura, Yoghurt plant, Zagreb, Croatia.
– Functional descriptions.
– I/O test on equipment.
– Commissioning and start up of the 12 line CIP plant.
– Commissioning all CIP on process equipment.
– Training personnel in daily running of the plant.
– Finalizing & handing over the project.
Mar. 1999 – Jun. 1999:
Masterlone, Cheese plant, Argentina.
– Functional descriptions.
– Commissioning of 2 central CIP plants and all CIP on Cheese and brining equipment.
– Training personnel in daily running of the plant.
Apr. 1998 – Jun. 1998:
Mao Ammerland Milchwerke, Ammerland, Germany.
– Commissioning of the central CIP plant and all CIP on Cheese and brining equipment.
Feb. 1997 – Dec. 1997:
I.D.E.C Iran
– Commissioning of 2 UF Feta Cheese plants.
– Commissioning of 4 traditional Feta Cheese plants.
– Training personnel in daily running of the plants.
– Finalizing & handing over the projects.
Mar. 1996 – Dec. 1996:
Almarai, Milk, juice and deserts processing plant, Saudi Arabia.
– Commissioning of 1 central CIP plant and all CIP on process equipment.
– Commissioning of the Laban process plant.
– Commissioning 2 culture production plants.
1989 – 1996:
Frisko Ice Cream, Aarhus ,Denmark.
– 1 year of processing ice cream on RIA equipment.
– 6 years in mixing plant.